Baku Metro
The supply contract of 112 Door Platform Screen Door system to Purple Line, a new line under construction of Baku Metro in Azerbaijan, is under progress. It includes system design, manufacturing, supply, installation, testing and commissioning. The signaling system will be applied to the PSD motion and controlled in conjunction with PCU. The train will run in shuttle between Memar Ajami (B02) and Avto Vagzal (B01)