Introduction

Interface between signaling system and PSD

Interlock between signal system and PSD is the system to interlock between train and PSD through interface between signaling system and PSD.

Opening

After the train stays at the right stop position, the opening motion performs when PSC (PG Central Interface Panel) receives the opening command from signaling system.

Closing

Before the train departs, the closing command performs when PSC receives the closing command from signaling system. When closing motion is completed, PSC transmits the completion of closing command to signaling system.
The PSC at each station transmits event information of PSD to PSL (PG Local control Panel) in the OCC (Operation Control Center) and OCC can monitor the status of PSD at each station.

  • Signaling system Interface

System-Configuration

Interface between wireless receiving/transmitting system and PSD

Existing signaling system is the method used for the fact that it is impossible to interface with PSD so it needs to be remodeled but it is hard to do so.

Opening

After the train is at right stop position, wireless receiving/transmitting device inside the train transmits opening command of train doors to wireless receiving/transmitting device on the ground.

Closing

Before the train departs, wireless receiving/transmitting device inside the train transmits the closing command of train doors to wireless receiving/transmitting device on the ground. When PSC receives the closing command from wireless receiving/transmitting device on the ground, it performs the closing command and when the closing command is completed, PSC transmits the closing command to wireless receiving/transmitting device on the ground and then to wireless receiving/transmitting device inside the train to make train departed.

The PSC at each station transmits event information of PSD to PSL (PG Local control Panel) in the OCC (Operation Control Center) and OCC can monitor the status of PSD at each station.

  • RF system Interface

RFsystem-interface