PSD Installation

Home » Platform Screen Doors » PSD Installation

Installation type

Item Module Type Field Assembly Type
Description Doors, frame, header box, drives are assembled
as a module and tested at factory and This PSD
module is delivered to stations using a work
train and installed on site in a very efficient way
Doors, frame, header box, drives are delivered
to station and assembled & installed
Target Existing stations New stations
Delivery Motor car Crane & Manpower
Work process 4-stage
(Base work, Module install, Adjust, Finish work)
7-stage
(Base work, Post install, Header box install, Base
install, Door install, Adjust, Finish work)
Features * Installation time cut sharply
* Quality Consistency
* No on-site error by pre-test
* No Staging on Platform
* More Passenger Convenience
* Best for existing stations requiring fast installation
* Restriction
– Motor car shall be available
– Track occupancy during installation period
– Need a installation Jig
* Best for new stations
* Installable without motor car & track
occupancy
* Require a lot of manpower

Installation Process(Module type)

installationprocess01

1. Ship PSD unit to station by Motorcar

installationprocess02

2. Anchor PSD unit to bottom

installationprocess03

3. Connect PSD to upper structure

installationprocess04

4. Install finishing panel on upper structure

installationprocess05

5. Finish PSD installation Full Height PSD

Installation Process(Field Assembly type)

field-assembly-type01

Post

field-assembly-type02

Header Box

field-assembly-type03

Base

Field-assembly-type04

Middle Post

field-assembly-type05

Sliding Door

field-assembly-type06

EED & Fixed Door

field-assembly-type07

Cover

field-assembly-type08

Complete