Cabling System

Home » Platform Screen Doors » PSD Engine » Cabling System

Cabling System

Cable harnessing in a factory prevents errors and connection faults.
Cable harnessing is to be examined before delivery.
System configuration is completed only by connecting the cables on-site after PSD installation.
This reduces installation time from 80 people per day to 2 people per day.

cabling_01
cabling_02

cabling_03

Comments are closed.

Copyright@2010-2014 NRT Corp. All rights reserved.